KEY FACTS
CLIENT
BMD Constructions
GMC Surveying have been engaged by BMD Constructions to provide engineering surveying services for the bridge duplication at Mount Crosby.
GMC are involved ...
KEY FACTS
CLIENT
Fulton Hogan
GMC Surveying have been engaged by Fulton Hogan for the provision of surveying services on the enabling works for the Wambo Wind Farm.
The works are headed up by...
KEY FACTS
CLIENT
BMD Constructions
GMC Surveying are engaged by BMD Constructions to provide survey to the critical Defence KC-30A infrastructure project in the Northern Territory at RAAF Bas...
One of our surveyors recently completed a topographic survey in Thallon, Southwest QLD, where they were able to snap this image of the amazing silo art on the Graincorp facility. This artwork is part ...
Our Melbourne surveyors enjoying the sun while measuring fast static observations to tighten and brace a large traverse loop. The baselines are then reduced in TBC, adjusted and exported by creating a...
Our North Qld Surveyors completing a bridge scan after a rain event for a redesign and upgrade of the current structure #GMC #GMCVic #Scanning #SX10 #Revit #BIM #Bridges #Roads #Trimble #TBC
KEY FACTS
CLIENT
SEYMOUR WHYTE
PROJECT DURATION
2 years
WORKS REQUIRED
Engineering Survey, Monitoring and UAV Volumes
PROJECT VALUE
undisclosed
The Upper Yarra Dam was constructed in 1957 an is ope...
KEY FACTS
CLIENT
THE BRISBANE RACING CLUB
PROJECT DURATION
1 month
WORKS REQUIRED
Scanning and BIM model
PROJECT VALUE
undisclosed
Our client, The Brisbane Racing Club, were looking to perform work...
KEY FACTS
CLIENT
GEORGIOU
PROJECT DURATION
18 months
WORKS REQUIRED
Extensive drainage and UAV work
PROJECT VALUE
$1,000,000
SPRING GULLY POND C
GMCCS were engaged by Georgiou to provide survey se...
KEY FACTS
CLIENT
FKG
PROJECT DURATION
WORKS REQUIRED
PROJECT VALUE
GMCCS were engaged to supply survey on four sections of the Warrego Highway. Work included installation and c...