MOUNT CROSBY BRIDGE

May 3rd, 2023

KEY FACTS CLIENT BMD Constructions   GMC Surveying have been engaged by BMD Constructions to provide engineering surveying services for the bridge duplication at Mount Crosby. GMC are involved ...

Read more

WAMBO WIND FARM – ENABLING WORKS

May 1st, 2023

KEY FACTS CLIENT Fulton Hogan   GMC Surveying have been engaged by Fulton Hogan for the provision of surveying services on the enabling works for the Wambo Wind Farm. The works are headed up by...

Read more

RAAF BASE TINDAL

May 1st, 2023

KEY FACTS CLIENT BMD Constructions   GMC Surveying are engaged by BMD Constructions to provide survey to the critical Defence KC-30A infrastructure project in the Northern Territory at RAAF Bas...

Read more

21/02/2022

February 21st, 2022

One of our surveyors recently completed a topographic survey in Thallon, Southwest QLD, where they were able to snap this image of the amazing silo art on the Graincorp facility. This artwork is part ...

Read more

GPS Control Survey

February 14th, 2022

Our Melbourne surveyors enjoying the sun while measuring fast static observations to tighten and brace a large traverse loop. The baselines are then reduced in TBC, adjusted and exported by creating a...

Read more

Bridge Setout

February 9th, 2022

It's always a good feeling when that first girder fits in place. #GMC #GMCVic #Bridges #Roads #Trimble #TSC7 #millimeters

Read more

Building Setout

January 31st, 2022

Setout is never an easy task. There is always more than one obstacle in the way. #GMC #GMCVic #Melbourne #Trimble #TSC7 #Construction #Moveoutofmyway

Read more

Bridge Scanning

January 22nd, 2022

Our North Qld Surveyors completing a bridge scan after a rain event for a redesign and upgrade of the current structure #GMC #GMCVic #Scanning #SX10 #Revit #BIM #Bridges #Roads #Trimble #TBC 

Read more

WARREGO HIGHWAY OVERTAKING LANES

March 14th, 2013

KEY FACTS CLIENT DOWNER PROJECT DURATION 12 months WORKS REQUIRED Pavement modelling, Control, Drainage Setout, Machine Control, Conformance Surveys PROJECT VALUE undisclosed GMC Surveying were eng...

Read more

UPPER YARRA DAM

March 5th, 2013

KEY FACTS CLIENT SEYMOUR WHYTE PROJECT DURATION 2 years WORKS REQUIRED Engineering Survey, Monitoring and UAV Volumes PROJECT VALUE undisclosed The Upper Yarra Dam was constructed in 1957 an is ope...

Read more

SCANNING AND BIM

February 14th, 2013

KEY FACTS CLIENT THE BRISBANE RACING CLUB PROJECT DURATION 1 month WORKS REQUIRED Scanning and BIM model PROJECT VALUE undisclosed Our client, The Brisbane Racing Club, were looking to perform work...

Read more

EARTHWORKS

February 14th, 2013

KEY FACTS CLIENT GEORGIOU PROJECT DURATION 18 months WORKS REQUIRED Extensive drainage and UAV work PROJECT VALUE $1,000,000 SPRING GULLY POND C GMCCS were engaged by Georgiou to provide survey se...

Read more

ROADWORKS & AIRPORT

February 2nd, 2013

KEY FACTS CLIENT FKG PROJECT DURATION   WORKS REQUIRED   PROJECT VALUE   GMCCS were engaged to supply survey on four sections of the Warrego Highway. Work included installation and c...